• SEARCH

ENGINEERING DEPARTMENT

The Engineering Department is responsible for the City’s capital improvements, land development, traffic engineering and storm water management.

  • Land Development reviews all private development projects, including subdivision maps, grading plans and improvement plans; issues encroachment, retaining wall, and grading permits; and administers the City’s storm water pollution prevention program.
  • The Capital Improvement Program provides for the planning, bidding and construction of new city-owned infrastructure and large scale maintenance of existing infrastructure, including park renovations, storm drain repairs, street repairs and paving, concrete maintenance and bridge repairs.
  • Traffic Engineering is responsible for maintenance of all City owned traffic signals, street lights, roadway striping and street signage. 
Mountains

Find What You're Looking For

In Santee, California

Encroachment
Permits

Flood
Zones

Grading
Permits

Moving &
Oversized Load Permits

Storm
Water

Traffic
Engineering

Mountains
Mountains

Engineering Department

Phone: 619-258-4100 ext. 167
Hours: M–Th 8:00am-5:00pm, F 8:00am-1:00pm

Santee City Hall, Engineering Department
10601 Magnolia Avenue, Building 4
Santee, CA 92071

Sign-up for City of Santee News & Alerts!

Get the latest information and updates to your inbox.

City of Santee Seal
City of Santee
10601 Magnolia Ave.
Santee, CA 92071
619-258-4100

City Hall Operational Hours:
M-Th 8:00am – 5:00pm, F 8:00am – 1:00pm

City of Santee App
Download MySanteeCA
Mobile App for City of Santee
Join THE CITY OF SANTEE Online
Visit us on Facebook
Visit us on Instagram
Visit us on YouTube
Visit us on X (Twitter)

© 2024 City of Santee, California. All Rights Reserved.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Website Design & Development by JET Advertising.